Status
Finished
Total time 4h00m56s
Finished at Sat 14 Nov 11:00:56
Effort today
Current Performance Index: 508
iTRA PI 446 · running 14% above career level — PB pace
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 37525044
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 37525044
Aid station schedule
START · 0.0 km ✓
out07:00:00
A8 · 7.4 km · Current PI 446 ✓
37th overall · 36th male
Section time 41m33s · 5:37 /km
Section 7.4 km · +224 / −194 m
expected at07:53 cut-off at09:30
in07:41:33
11 min FASTER than expected
Section PI 633 — way above career, blow-up risk
W2 · 17.7 km · Current PI 577 ✓
52nd overall · 48th male (▼ down 15)
Section time 1h25m08s · 8:16 /km
Section 10.3 km · +578 / −528 m
expected at08:51 cut-off at12:50
in09:06:41
14 min SLOWER than expected
Section PI 509 — going harder than career
A8 (2nd visit) · 23.8 km · Current PI 490 ✓
50th overall · 46th male (▲ up 2)
Section time 42m01s · 7:00 /km
Section 6.0 km · +129 / −177 m
expected at09:51 cut-off at14:20
in09:48:42
2 min FASTER than expected
Section PI 485 — at career level
FINISH · 32.1 km · Current PI 473 ✓
44th overall · 40th male (▲ up 6)
Section time 1h12m14s · 8:42 /km
Section 8.3 km · +358 / −388 m
expected at10:57 cut-off at17:00
in11:00:56
2 min SLOWER than expected
Section PI 448 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run