Status
Finished
Total time 6h36m29s
Finished at Sat 14 Nov 13:36:29
Effort today
Current Performance Index: 309
iTRA PI 309 · running at career level (100%)
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 766532548505
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 766532548505
Aid station schedule
START · 0.0 km ✓
out07:00:00
A8 · 7.4 km · Current PI 309 ✓
766th overall · 482nd male
Section time 1h13m17s · 9:54 /km
Section 7.4 km · +224 / −194 m
expected at08:17 cut-off at09:30
in08:13:17
3 min FASTER than expected
Section PI 359 — at career level
W2 · 17.7 km · Current PI 344 ✓
532nd overall · 376th male (▲ up 234)
Section time 2h07m23s · 12:22 /km
Section 10.3 km · +578 / −528 m
expected at10:17 cut-off at12:50
in10:20:40
3 min SLOWER than expected
Section PI 340 — at career level
A8 (2nd visit) · 23.8 km · Current PI 331 ✓
548th overall · 377th male (▼ down 16)
Section time 1h19m30s · 13:15 /km
Section 6.0 km · +129 / −177 m
expected at11:31 cut-off at14:20
in11:40:10
8 min SLOWER than expected
Section PI 256 — easing off / mild fade
FINISH · 32.1 km · Current PI 272 ✓
505th overall · 346th male (▲ up 43)
Section time 1h56m19s · 14:01 /km
Section 8.3 km · +358 / −388 m
expected at13:35 cut-off at17:00
in13:36:29
1 min SLOWER than expected
Section PI 278 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run