Status
Finished
Total time 7h00m15s
Finished at Sat 14 Nov 14:00:15
Effort today
Current Performance Index: 291
iTRA PI 289 · running at career level (101%)
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 620648638600
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 620648638600
Aid station schedule
START · 0.0 km ✓
out07:00:00
A8 · 7.4 km · Current PI 289 ✓
620th overall · 416th male
Section time 1h07m33s · 9:08 /km
Section 7.4 km · +224 / −194 m
expected at08:22 cut-off at09:30
in08:07:33
14 min FASTER than expected
Section PI 389 — way above career, blow-up risk
W2 · 17.7 km · Current PI 359 ✓
648th overall · 434th male (▼ down 28)
Section time 2h27m19s · 14:18 /km
Section 10.3 km · +578 / −528 m
expected at10:01 cut-off at12:50
in10:34:52
32 min SLOWER than expected
Section PI 294 — at career level
A8 (2nd visit) · 23.8 km · Current PI 293 ✓
638th overall · 423rd male (▲ up 10)
Section time 1h20m40s · 13:27 /km
Section 6.0 km · +129 / −177 m
expected at11:50 cut-off at14:20
in11:55:32
5 min SLOWER than expected
Section PI 252 — at career level
FINISH · 32.1 km · Current PI 263 ✓
600th overall · 399th male (▲ up 38)
Section time 2h04m43s · 15:02 /km
Section 8.3 km · +358 / −388 m
expected at13:56 cut-off at17:00
in14:00:15
3 min SLOWER than expected
Section PI 260 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run