Status
Finished
Total time 4h24m01s
Finished at Sat 14 Nov 11:24:01
Effort today
Current Performance Index: 463
iTRA PI 415 · running 12% above career level — PB pace
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 72758380
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 72758380
Aid station schedule
START · 0.0 km ✓
out07:00:00
A8 · 7.4 km · Current PI 415 ✓
72nd overall · 63rd male
Section time 45m24s · 6:08 /km
Section 7.4 km · +224 / −194 m
expected at07:57 cut-off at09:30
in07:45:24
11 min FASTER than expected
Section PI 579 — way above career, blow-up risk
W2 · 17.7 km · Current PI 530 ✓
75th overall · 67th male (▼ down 3)
Section time 1h28m41s · 8:37 /km
Section 10.3 km · +578 / −528 m
expected at09:02 cut-off at12:50
in09:14:05
11 min SLOWER than expected
Section PI 489 — going harder than career
A8 (2nd visit) · 23.8 km · Current PI 466 ✓
83rd overall · 72nd male (▼ down 8)
Section time 50m10s · 8:22 /km
Section 6.0 km · +129 / −177 m
expected at10:01 cut-off at14:20
in10:04:15
2 min SLOWER than expected
Section PI 406 — at career level
FINISH · 32.1 km · Current PI 409 ✓
80th overall · 67th male (▲ up 3)
Section time 1h19m46s · 9:37 /km
Section 8.3 km · +358 / −388 m
expected at11:19 cut-off at17:00
in11:24:01
4 min SLOWER than expected
Section PI 406 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run