Status
Finished
Total time 9h31m35s
Finished at Sat 14 Nov 16:46:35
Effort today
Current Performance Index: 214
iTRA PI 247 · running 13% below career level — fading
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 915907916914
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 915907916914
Aid station schedule
START · 0.0 km ✓
out07:15:00
A8 · 7.4 km · Current PI 247 ✓
915th overall · 560th male
Section time 1h23m56s · 11:21 /km
Section 7.4 km · +224 / −194 m
expected at08:51 cut-off at09:30
in08:38:56
12 min FASTER than expected
Section PI 313 — going harder than career
W2 · 17.7 km · Current PI 293 ✓
907th overall · 557th male (▲ up 8)
Section time 3h05m46s · 18:02 /km
Section 10.3 km · +578 / −528 m
expected at11:01 cut-off at12:50
in11:44:42
43 min SLOWER than expected
Section PI 233 — at career level
A8 (2nd visit) · 23.8 km · Current PI 237 ✓
916th overall · 561st male (▼ down 9)
Section time 1h54m57s · 19:10 /km
Section 6.0 km · +129 / −177 m
expected at13:19 cut-off at14:20
in13:39:39
19 min SLOWER than expected
Section PI 177 — easing off / mild fade
FINISH · 32.1 km · Current PI 198 ✓
914th overall · 557th male (▲ up 2)
Section time 3h06m56s · 22:31 /km
Section 8.3 km · +358 / −388 m
expected at16:17 cut-off at17:00
in16:46:35
29 min SLOWER than expected
Section PI 173 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run