Status
Finished
Total time 4h43m18s
Finished at Sat 14 Nov 11:43:18
Effort today
Current Performance Index: 432
iTRA PI 435 · running at career level (99%)
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 128125115108
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 128125115108
Aid station schedule
START · 0.0 km ✓
out07:00:00
A8 · 7.4 km · Current PI 435 ✓
128th overall · 23rd female
Section time 49m48s · 6:44 /km
Section 7.4 km · +224 / −194 m
expected at07:54 cut-off at09:30
in07:49:48
4 min FASTER than expected
Section PI 528 — going harder than career
W2 · 17.7 km · Current PI 500 ✓
125th overall · 20th female (▲ up 3)
Section time 1h38m23s · 9:33 /km
Section 10.3 km · +578 / −528 m
expected at09:14 cut-off at12:50
in09:28:11
14 min SLOWER than expected
Section PI 440 — at career level
A8 (2nd visit) · 23.8 km · Current PI 439 ✓
115th overall · 19th female (▲ up 10)
Section time 50m00s · 8:20 /km
Section 6.0 km · +129 / −177 m
expected at10:20 cut-off at14:20
in10:18:11
2 min FASTER than expected
Section PI 407 — at career level
FINISH · 32.1 km · Current PI 416 ✓
108th overall · 20th female (▲ up 7)
Section time 1h25m07s · 10:15 /km
Section 8.3 km · +358 / −388 m
expected at11:39 cut-off at17:00
in11:43:18
3 min SLOWER than expected
Section PI 380 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run