Status
Finished
Total time 7h31m22s
Finished at Sat 14 Nov 14:46:22
Effort today
Current Performance Index: 271
iTRA PI 260 · running at career level (104%)
Course profile 32 km · +1,289 m
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 538706710711
START A8 W2 A8 FINISH
Position overall at each station (1st at the top, 944 at the bottom)
1st944th 538706710711
Aid station schedule
START · 0.0 km ✓
out07:15:00
A8 · 7.4 km · Current PI 260 ✓
538th overall · 162nd female
Section time 1h04m31s · 8:43 /km
Section 7.4 km · +224 / −194 m
expected at08:46 cut-off at09:30
in08:19:31
27 min FASTER than expected
Section PI 408 — way above career, blow-up risk
W2 · 17.7 km · Current PI 363 ✓
706th overall · 240th female (▼ down 168)
Section time 2h38m32s · 15:23 /km
Section 10.3 km · +578 / −528 m
expected at10:08 cut-off at12:50
in10:58:03
49 min SLOWER than expected
Section PI 273 — at career level
A8 (2nd visit) · 23.8 km · Current PI 269 ✓
710th overall · 243rd female (▼ down 4)
Section time 1h24m38s · 14:06 /km
Section 6.0 km · +129 / −177 m
expected at12:16 cut-off at14:20
in12:22:41
6 min SLOWER than expected
Section PI 241 — at career level
FINISH · 32.1 km · Current PI 246 ✓
711th overall · 250th female (▼ down 1)
Section time 2h23m41s · 17:19 /km
Section 8.3 km · +358 / −388 m
expected at14:28 cut-off at17:00
in14:46:22
17 min SLOWER than expected
Section PI 225 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run