Status
Finished
Total time 5h03m54s
Finished at Sat 14 Nov 11:03:54
Effort today
Current Performance Index: 874
iTRA PI 748 · running 17% above career level — PB pace
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 21111
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 21111
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km · Current PI 748 ✓
2nd overall · 2nd male
Section time 1h21m03s · 6:49 /km
Section 11.9 km · +1137 / −117 m
expected at07:35 cut-off at10:20
in07:21:03
14 min FASTER than expected
Section PI 924 — way above career, blow-up risk
W0 · 25.6 km · Current PI 871 ✓
1st overall · 1st male (▲ up 1)
Section time 1h24m33s · 6:10 /km
Section 13.7 km · +870 / −955 m
expected at08:40 cut-off at14:50
in08:45:36
4 min SLOWER than expected
Section PI 906 — way above career, blow-up risk
A7 · 31.4 km · Current PI 859 ✓
1st overall · 1st male
Section time 30m40s · 5:17 /km
Section 5.8 km · +50 / −790 m
expected at09:19 cut-off at16:30
in09:16:16
3 min FASTER than expected
Section PI 817 — going harder than career
A8 · 42.2 km · Current PI 796 ✓
1st overall · 1st male
Section time 56m22s · 5:13 /km
Section 10.8 km · +277 / −444 m
expected at10:14 cut-off at19:25
in10:12:38
1 min FASTER than expected
Section PI 850 — way above career, blow-up risk
FINISH · 50.5 km · Current PI 819 ✓
1st overall · 1st male
Section time 51m16s · 6:11 /km
Section 8.3 km · +358 / −388 m
expected at11:01 cut-off at22:00
in11:03:54
2 min SLOWER than expected
Section PI 801 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run