Status
Finished
Total time 6h52m56s
Finished at Sat 14 Nov 12:52:56
Effort today
Current Performance Index: 643
iTRA PI 568 · running 13% above career level — PB pace
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 2020191515
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 2020191515
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km · Current PI 568 ✓
20th overall · 19th male
Section time 1h42m33s · 8:37 /km
Section 11.9 km · +1137 / −117 m
expected at08:05 cut-off at10:20
in07:42:33
23 min FASTER than expected
Section PI 731 — way above career, blow-up risk
W0 · 25.6 km · Current PI 682 ✓
20th overall · 19th male
Section time 2h00m29s · 8:48 /km
Section 13.7 km · +870 / −955 m
expected at09:23 cut-off at14:50
in09:43:02
19 min SLOWER than expected
Section PI 636 — going harder than career
A7 · 31.4 km · Current PI 615 ✓
19th overall · 18th male (▲ up 1)
Section time 40m24s · 6:58 /km
Section 5.8 km · +50 / −790 m
expected at10:28 cut-off at16:30
in10:23:26
5 min FASTER than expected
Section PI 620 — going harder than career
A8 · 42.2 km · Current PI 605 ✓
15th overall · 15th male (▲ up 4)
Section time 1h20m25s · 7:27 /km
Section 10.8 km · +277 / −444 m
expected at11:41 cut-off at19:25
in11:43:51
2 min SLOWER than expected
Section PI 595 — at career level
FINISH · 50.5 km · Current PI 587 ✓
15th overall · 15th male
Section time 1h09m05s · 8:19 /km
Section 8.3 km · +358 / −388 m
expected at12:50 cut-off at22:00
in12:52:56
2 min SLOWER than expected
Section PI 594 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run