Status
Finished
Total time 12h36m57s
Finished at Sat 14 Nov 18:36:57
Effort today
Current Performance Index: 351
iTRA PI 288 · running 22% above career level — PB pace
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 367355323318322
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 367355323318322
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km · Current PI 288 ✓
367th overall · 293rd male
Section time 2h47m22s · 14:04 /km
Section 11.9 km · +1137 / −117 m
expected at10:08 cut-off at10:20
in08:47:22
80 min FASTER than expected
Section PI 448 — way above career, blow-up risk
W0 · 25.6 km · Current PI 400 ✓
355th overall · 280th male (▲ up 12)
Section time 3h42m14s · 16:13 /km
Section 13.7 km · +870 / −955 m
expected at11:32 cut-off at14:50
in12:29:36
57 min SLOWER than expected
Section PI 345 — going harder than career
A7 · 31.4 km · Current PI 328 ✓
323rd overall · 256th male (▲ up 32)
Section time 1h13m13s · 12:37 /km
Section 5.8 km · +50 / −790 m
expected at13:49 cut-off at16:30
in13:42:49
6 min FASTER than expected
Section PI 342 — going harder than career
A8 · 42.2 km · Current PI 326 ✓
318th overall · 249th male (▲ up 5)
Section time 2h32m40s · 14:08 /km
Section 10.8 km · +277 / −444 m
expected at16:00 cut-off at19:25
in16:15:29
15 min SLOWER than expected
Section PI 314 — at career level
FINISH · 50.5 km · Current PI 306 ✓
322nd overall · 253rd male (▼ down 4)
Section time 2h21m28s · 17:03 /km
Section 8.3 km · +358 / −388 m
expected at18:15 cut-off at22:00
in18:36:57
21 min SLOWER than expected
Section PI 290 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run