Status
Finished
Total time 7h41m50s
Finished at Sat 14 Nov 13:41:50
Effort today
Current Performance Index: 575
(no iTRA PI) · Current PI: 575
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 3430303031
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 3430303031
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km ✓
34th overall · 30th male
Section time 1h48m13s · 9:06 /km
Section 11.9 km · +1137 / −117 m
cut-off at10:20
in07:48:13
Section PI 692
W0 · 25.6 km · Current PI 692 ✓
30th overall · 27th male (▲ up 4)
Section time 2h06m13s · 9:13 /km
Section 13.7 km · +870 / −955 m
expected at09:34 cut-off at14:50
in09:54:26
19 min SLOWER than expected
Section PI 607
A7 · 31.4 km · Current PI 607 ✓
30th overall · 27th male
Section time 45m23s · 7:49 /km
Section 5.8 km · +50 / −790 m
expected at10:42 cut-off at16:30
in10:39:49
2 min FASTER than expected
Section PI 552
A8 · 42.2 km · Current PI 552 ✓
30th overall · 27th male
Section time 1h37m33s · 9:02 /km
Section 10.8 km · +277 / −444 m
expected at12:02 cut-off at19:25
in12:17:22
14 min SLOWER than expected
Section PI 491
FINISH · 50.5 km · Current PI 491 ✓
31st overall · 28th male (▼ down 1)
Section time 1h24m28s · 10:11 /km
Section 8.3 km · +358 / −388 m
expected at13:30 cut-off at22:00
in13:41:50
10 min SLOWER than expected
Section PI 486
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run