Status
Finished
Total time 14h07m50s
Finished at Sat 14 Nov 20:07:50
Effort today
Current Performance Index: 313
iTRA PI 321 · running at career level (98%)
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 421424413407
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 421424413407
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km
Section 11.9 km · +1137 / −117 m
cut-off at10:20
W0 · 25.6 km · Current PI 321 ✓
421st overall · 102nd female
Section time 7h08m40s · 16:45 /km
Section 25.6 km · +2007 / −1072 m
cut-off at14:50
in13:08:40
Section PI 353 — at career level
A7 · 31.4 km · Current PI 344 ✓
424th overall · 105th female (▼ down 3)
Section time 1h42m30s · 17:40 /km
Section 5.8 km · +50 / −790 m
expected at16:06 cut-off at16:30
in14:51:10
75 min FASTER than expected
Section PI 245 — easing off / mild fade
A8 · 42.2 km · Current PI 267 ✓
413th overall · 104th female (▲ up 11)
Section time 2h44m45s · 15:15 /km
Section 10.8 km · +277 / −444 m
expected at19:21 cut-off at19:25
in17:35:55
105 min FASTER than expected
Section PI 291 — at career level
FINISH · 50.5 km · Current PI 300 ✓
407th overall · 100th female (▲ up 6)
Section time 2h31m55s · 18:18 /km
Section 8.3 km · +358 / −388 m
expected at20:55 cut-off at22:00
in20:07:50
48 min FASTER than expected
Section PI 270 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run