Status
Finished
Total time 14h41m28s
Finished at Sat 14 Nov 20:41:28
Effort today
Current Performance Index: 301
iTRA PI 288 · running at career level (105%)
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 418423433444435
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 418423433444435
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km · Current PI 288 ✓
418th overall · 98th female
Section time 3h01m06s · 15:13 /km
Section 11.9 km · +1137 / −117 m
expected at10:08 cut-off at10:20
in09:01:06
67 min FASTER than expected
Section PI 414 — way above career, blow-up risk
W0 · 25.6 km · Current PI 376 ✓
423rd overall · 104th female (▼ down 5)
Section time 4h09m09s · 18:11 /km
Section 13.7 km · +870 / −955 m
expected at11:59 cut-off at14:50
in13:10:15
70 min SLOWER than expected
Section PI 307 — at career level
A7 · 31.4 km · Current PI 302 ✓
433rd overall · 108th female (▼ down 10)
Section time 1h56m39s · 20:07 /km
Section 5.8 km · +50 / −790 m
expected at14:38 cut-off at16:30
in15:06:54
28 min SLOWER than expected
Section PI 215 — easing off / mild fade
A8 · 42.2 km · Current PI 237 ✓
444th overall · 114th female (▼ down 11)
Section time 3h05m21s · 17:10 /km
Section 10.8 km · +277 / −444 m
expected at17:49 cut-off at19:25
in18:12:15
23 min SLOWER than expected
Section PI 258 — at career level
FINISH · 50.5 km · Current PI 267 ✓
435th overall · 112th female (▲ up 9)
Section time 2h29m13s · 17:59 /km
Section 8.3 km · +358 / −388 m
expected at20:34 cut-off at22:00
in20:41:28
6 min SLOWER than expected
Section PI 275 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run