Status
Finished
Total time 14h22m02s
Finished at Sat 14 Nov 20:22:02
Effort today
Current Performance Index: 308
(no iTRA PI) · Current PI: 308
Course profile 50 km · +2,693 m
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 459430426416418
START A0 W0 A7 A8 FINISH
Position overall at each station (1st at the top, 485 at the bottom)
1st485th 459430426416418
Aid station schedule
START · 0.0 km ✓
out06:00:00
A0 · 11.9 km ✓
459th overall · 120th female
Section time 3h19m15s · 16:45 /km
Section 11.9 km · +1137 / −117 m
cut-off at10:20
in09:19:15
Section PI 376
W0 · 25.6 km · Current PI 376 ✓
430th overall · 108th female (▲ up 29)
Section time 3h56m39s · 17:16 /km
Section 13.7 km · +870 / −955 m
expected at12:35 cut-off at14:50
in13:15:54
40 min SLOWER than expected
Section PI 324
A7 · 31.4 km · Current PI 324 ✓
426th overall · 107th female (▲ up 4)
Section time 1h37m03s · 16:44 /km
Section 5.8 km · +50 / −790 m
expected at14:45 cut-off at16:30
in14:52:57
7 min SLOWER than expected
Section PI 258
A8 · 42.2 km · Current PI 258 ✓
416th overall · 106th female (▲ up 10)
Section time 2h48m11s · 15:34 /km
Section 10.8 km · +277 / −444 m
expected at17:31 cut-off at19:25
in17:41:08
10 min SLOWER than expected
Section PI 285
FINISH · 50.5 km · Current PI 285 ✓
418th overall · 106th female (▼ down 2)
Section time 2h40m54s · 19:23 /km
Section 8.3 km · +358 / −388 m
expected at19:57 cut-off at22:00
in20:22:02
24 min SLOWER than expected
Section PI 255
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run