← 100KM leaderboard

SORANARAKSOPON, PORNSAK

Race 100KM · Bib 9019 · Male · iTRA PI 467
Status
Withdrawn
Last seen at A6
On course for 9h36m20s before withdrawal.
Effort today
Current PI: 469
iTRA PI 467 · running at career level (100%)
Aid station schedule
START · 0.0 km
in05:00:00
A1_1 · 4.9 km · Current PI 467
Section time 39m07s
Section 4.9 km · +78 / −224 m
cut-off at06:00
in05:39:07
4 min SLOWER than expected
Section PI 570 — way above career, blow-up risk
A2_1 · 14.1 km · Current PI 539
Section time 1h44m35s
Section 9.2 km · +479 / −547 m
cut-off at08:50
in07:23:42
3 min SLOWER than expected
Section PI 502 — at career level
A3_1 · 25.3 km · Current PI 491
Section time 2h39m02s
Section 11.2 km · +713 / −699 m
cut-off at12:15
in10:02:44
2 min SLOWER than expected
Section PI 428 — at career level
A4_1 · 32.3 km · Current PI 439
Section time 1h06m23s
Section 7.0 km · +206 / −217 m
cut-off at13:50
in11:09:07
1 min FASTER than expected
Section PI 515 — at career level
A5_1 · 42.5 km · Current PI 501
Section time 1h31m28s
Section 10.2 km · +267 / −206 m
cut-off at16:15
in12:40:35
10 min FASTER than expected
Section PI 529 — going harder than career
W1_1 · 48.3 km · Current PI 510
Section time 1h30m17s
Section 5.8 km · +365 / −63 m
cut-off at18:05
in14:10:52
4 min SLOWER than expected
Section PI 377 — easing off / mild fade
A6 · 50.8 km · Current PI 404
Section time 25m28s
Section 2.5 km · +21 / −173 m
cut-off at18:35
in14:36:20
0 min SLOWER than expected
Section PI 427 — at career level
A1_2 · 55.7 km
Section 4.9 km · +78 / −224 m
cut-off at19:40
A2_2 · 64.9 km
Section 9.2 km · +479 / −547 m
cut-off at22:40
A3_2 · 76.1 km
Section 11.2 km · +713 / −699 m
cut-off at02:10
A4_2 · 83.1 km
Section 7.0 km · +206 / −217 m
cut-off at03:50
A5_2 · 93.2 km
Section 10.2 km · +267 / −206 m
cut-off at06:30
W1_2 · 99.1 km
Section 5.8 km · +365 / −63 m
cut-off at08:30
FINISH · 101.4 km
Section 2.3 km · +16 / −168 m
cut-off at09:00
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.