← 100KM leaderboard

HANSITH, JARESAK

Race 100KM · Bib 9061 · Male · iTRA PI 398
Status
Withdrawn
Last seen at A6
On course for 11h24m23s before withdrawal.
Effort today
Current PI: 395
iTRA PI 398 · running at career level (99%)
Aid station schedule
START · 0.0 km
in05:00:00
A1_1 · 4.9 km · Current PI 398
Section time 39m00s
Section 4.9 km · +78 / −224 m
cut-off at06:00
in05:39:00
1 min FASTER than expected
Section PI 572 — way above career, blow-up risk
A2_1 · 14.1 km · Current PI 519
Section time 1h55m10s
Section 9.2 km · +479 / −547 m
cut-off at08:50
in07:34:10
14 min SLOWER than expected
Section PI 456 — going harder than career
A3_1 · 25.3 km · Current PI 438
Section time 3h16m01s
Section 11.2 km · +713 / −699 m
cut-off at12:15
in10:50:11
27 min SLOWER than expected
Section PI 347 — easing off / mild fade
A4_1 · 32.3 km · Current PI 362
Section time 1h27m04s
Section 7.0 km · +206 / −217 m
cut-off at13:50
in12:17:15
8 min SLOWER than expected
Section PI 393 — at career level
A5_1 · 42.5 km · Current PI 394
Section time 1h53m55s
Section 10.2 km · +267 / −206 m
cut-off at16:15
in14:11:10
6 min FASTER than expected
Section PI 425 — at career level
W1_1 · 48.3 km · Current PI 417
Section time 1h34m15s
Section 5.8 km · +365 / −63 m
cut-off at18:05
in15:45:25
8 min FASTER than expected
Section PI 361 — at career level
A6 · 50.8 km · Current PI 372
Section time 38m58s
Section 2.5 km · +21 / −173 m
cut-off at18:35
in16:24:23
9 min SLOWER than expected
Section PI 279 — easing off / mild fade
A1_2 · 55.7 km
Section 4.9 km · +78 / −224 m
cut-off at19:40
A2_2 · 64.9 km
Section 9.2 km · +479 / −547 m
cut-off at22:40
A3_2 · 76.1 km
Section 11.2 km · +713 / −699 m
cut-off at02:10
A4_2 · 83.1 km
Section 7.0 km · +206 / −217 m
cut-off at03:50
A5_2 · 93.2 km
Section 10.2 km · +267 / −206 m
cut-off at06:30
W1_2 · 99.1 km
Section 5.8 km · +365 / −63 m
cut-off at08:30
FINISH · 101.4 km
Section 2.3 km · +16 / −168 m
cut-off at09:00
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.