← 25KM leaderboard

KHAIKAEW, JUNLAWAT

Race 25KM · Bib 2033 · Male · iTRA PI 420
Status
Finished
Total time 4h50m31s
Finished at Sun 28 Jun 10:50:31
Effort today
Current PI: 395
iTRA PI 420 · running 6% below career level — fading
Aid station schedule
START · 0.0 km
in06:00:00
A1 · 4.9 km · Current PI 420
Section time 32m12s
Section 4.9 km · +78 / −224 m
expected at06:31 cut-off at06:50
in06:32:12
0 min SLOWER than expected
Section PI 533 — way above career, blow-up risk
W0 · 13.5 km · Current PI 499
Section time 1h51m51s
Section 8.6 km · +499 / −486 m
expected at08:17 cut-off at09:20
in08:24:03
6 min SLOWER than expected
Section PI 346 — easing off / mild fade
A5 · 20.7 km · Current PI 368
Section time 59m17s
Section 7.2 km · +130 / −149 m
expected at09:19 cut-off at10:50
in09:23:20
4 min SLOWER than expected
Section PI 421 — at career level
W1 · 26.5 km · Current PI 420
Section time 1h08m27s
Section 5.8 km · +365 / −63 m
expected at10:36 cut-off at12:30
in10:31:47
4 min FASTER than expected
Section PI 382 — at career level
FINISH · 28.8 km · Current PI 394
Section time 18m44s
Section 2.3 km · +16 / −168 m
expected at10:50 cut-off at13:00
in10:50:31
matched expected pace
Section PI 419 — at career level
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.