← 25KM leaderboard

CHUTICHAIWATANA, WAJAKORN

Race 25KM · Bib 2125 · Male · iTRA PI 311
Status
Finished
Total time 6h27m27s
Finished at Sun 28 Jun 12:27:27
Effort today
Current PI: 296
iTRA PI 311 · running at career level (95%)
Aid station schedule
START · 0.0 km
in06:00:00
A1 · 4.9 km · Current PI 311
Section time 43m29s
Section 4.9 km · +78 / −224 m
expected at06:42 cut-off at06:50
in06:43:29
0 min SLOWER than expected
Section PI 394 — going harder than career
W0 · 13.5 km · Current PI 369
Section time 2h28m08s
Section 8.6 km · +499 / −486 m
expected at09:06 cut-off at09:20
in09:11:37
5 min SLOWER than expected
Section PI 261 — at career level
A5 · 20.7 km · Current PI 276
Section time 1h20m34s
Section 7.2 km · +130 / −149 m
expected at10:25 cut-off at10:50
in10:32:11
7 min SLOWER than expected
Section PI 310 — at career level
W1 · 26.5 km · Current PI 310
Section time 1h35m37s
Section 5.8 km · +365 / −63 m
expected at12:10 cut-off at12:30
in12:07:48
2 min FASTER than expected
Section PI 274 — at career level
FINISH · 28.8 km · Current PI 285
Section time 19m39s
Section 2.3 km · +16 / −168 m
expected at12:33 cut-off at13:00
in12:27:27
5 min FASTER than expected
Section PI 400 — going harder than career
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.