← 25KM leaderboard

WONGCHAROENWATTHANA, RAPEEPONG

Race 25KM · Bib 2162 · Male · iTRA PI 270
Status
Finished
Total time 4h35m01s
Finished at Sun 28 Jun 10:35:01
Effort today
Current PI: 417
iTRA PI 270 · running 55% above career level — PB pace
Aid station schedule
START · 0.0 km
in06:00:00
A1 · 4.9 km · Current PI 270
Section time 47m15s
Section 4.9 km · +78 / −224 m
expected at06:49 cut-off at06:50
in06:47:15
2 min FASTER than expected
Section PI 363 — going harder than career
W0 · 13.5 km · Current PI 335
Section time 1h43m15s
Section 8.6 km · +499 / −486 m
expected at09:22 cut-off at09:20
in08:30:30
51 min FASTER than expected
Section PI 375 — way above career, blow-up risk
A5 · 20.7 km · Current PI 343
Section time 52m37s
Section 7.2 km · +130 / −149 m
expected at09:28 cut-off at10:50
in09:23:07
5 min FASTER than expected
Section PI 474 — way above career, blow-up risk
W1 · 26.5 km · Current PI 413
Section time 56m43s
Section 5.8 km · +365 / −63 m
expected at10:36 cut-off at12:30
in10:19:50
16 min FASTER than expected
Section PI 461 — way above career, blow-up risk
FINISH · 28.8 km · Current PI 404
Section time 15m11s
Section 2.3 km · +16 / −168 m
expected at10:37 cut-off at13:00
in10:35:01
2 min FASTER than expected
Section PI 517 — way above career, blow-up risk
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.