← 25KM leaderboard

SINGSOPHON, PRAPHAN

Race 25KM · Bib 2356 · Male · (no iTRA PI)
Status
Finished
Total time 5h59m07s
Finished at Sun 28 Jun 12:14:07
Effort today
Current PI: 320
(no iTRA PI) · Current PI: 320
Aid station schedule
START · 0.0 km
in06:15:00
A1 · 4.9 km
Section time 56m16s
Section 4.9 km · +78 / −224 m
cut-off at06:50
in07:11:16
Section PI 305
W0 · 13.5 km · Current PI 305
Section time 2h24m44s
Section 8.6 km · +499 / −486 m
expected at10:15 cut-off at09:20
in09:36:00
39 min FASTER than expected
Section PI 267
A5 · 20.7 km · Current PI 267
Section time 1h07m39s
Section 7.2 km · +130 / −149 m
expected at10:53 cut-off at10:50
in10:43:39
9 min FASTER than expected
Section PI 369
W1 · 26.5 km · Current PI 369
Section time 1h09m30s
Section 5.8 km · +365 / −63 m
expected at12:20 cut-off at12:30
in11:53:09
27 min FASTER than expected
Section PI 376
FINISH · 28.8 km · Current PI 376
Section time 20m58s
Section 2.3 km · +16 / −168 m
expected at12:16 cut-off at13:00
in12:14:07
2 min FASTER than expected
Section PI 375
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.