Status
Withdrawn
Last seen at W1
On course for 7h48m42s before withdrawal.
Effort today
Current Performance Index: 228
(no iTRA PI) · Current PI: 228
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 300501521522
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 300501521522
The dot is this runner.
Aid station schedule
START · 0.0 km ✓
out06:15:00
A1 · 4.9 km ✓
300th overall · 206th male
Section time 45m01s · 9:11 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in07:00:01
Section PI 381
W0 · 13.5 km · Current PI 381 ✓
501st overall · 346th male (▼ down 201)
Section time 3h07m59s · 21:52 /km
Section 8.6 km · +499 / −486 m
cut-off at09:20
in10:08:00
40 min SLOWER than expected
Section PI 206
A5 · 20.7 km · Current PI 206 ✓
521st overall · 356th male (▼ down 20)
Section time 1h36m36s · 13:25 /km
Section 7.2 km · +130 / −149 m
cut-off at10:50
in11:44:36
7 min SLOWER than expected
Section PI 258
W1 · 26.5 km · Current PI 258 ✓
522nd overall · 356th male (▼ down 1)
Section time 2h19m06s · 23:59 /km
Section 5.8 km · +365 / −63 m
cut-off at12:30
in14:03:42
20 min SLOWER than expected
Section PI 188
FINISH · 28.8 km
Section 2.3 km · +16 / −168 m
cut-off at13:00
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run