Status
Finished
Total time 4h45m29s
Finished at Sun 28 Jun 10:45:29
Effort today
Current Performance Index: 402
(no iTRA PI) · Current PI: 402
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 8164677068
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 8164677068
Aid station schedule
START · 0.0 km ✓
out06:00:00
A1 · 4.9 km ✓
81st overall · 65th male
Section time 34m47s · 7:06 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in06:34:47
Section PI 493
W0 · 13.5 km · Current PI 493 ✓
64th overall · 55th male (▲ up 17)
Section time 1h44m33s · 12:09 /km
Section 8.6 km · +499 / −486 m
expected at08:28 cut-off at09:20
in08:19:20
9 min FASTER than expected
Section PI 370
A5 · 20.7 km · Current PI 370 ✓
67th overall · 54th male (▼ down 3)
Section time 57m10s · 7:56 /km
Section 7.2 km · +130 / −149 m
expected at09:12 cut-off at10:50
in09:16:30
3 min SLOWER than expected
Section PI 436
W1 · 26.5 km · Current PI 436 ✓
70th overall · 55th male (▼ down 3)
Section time 1h12m29s · 12:30 /km
Section 5.8 km · +365 / −63 m
expected at10:27 cut-off at12:30
in10:28:59
1 min SLOWER than expected
Section PI 361
FINISH · 28.8 km · Current PI 361 ✓
68th overall · 55th male (▲ up 2)
Section time 16m30s · 7:10 /km
Section 2.3 km · +16 / −168 m
expected at10:47 cut-off at13:00
in10:45:29
2 min FASTER than expected
Section PI 476
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run