Status
Finished
Total time 5h23m57s
Finished at Sun 28 Jun 11:23:57
Effort today
Current Performance Index: 354
iTRA PI 367 · running at career level (97%)
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 160150130128
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 160150130
Aid station schedule
START · 0.0 km ✓
out06:00:00
A1 · 4.9 km
Section 4.9 km · +78 / −224 m
cut-off at06:50
W0 · 13.5 km · Current PI 367 ✓
160th overall · 43rd female
Section time 2h46m55s · 12:22 /km
Section 13.5 km · +577 / −710 m
cut-off at09:20
in08:46:55
Section PI 335 — at career level
A5 · 20.7 km · Current PI 344 ✓
150th overall · 40th female (▲ up 10)
Section time 1h03m09s · 8:46 /km
Section 7.2 km · +130 / −149 m
expected at10:10 cut-off at10:50
in09:50:04
20 min FASTER than expected
Section PI 395 — at career level
W1 · 26.5 km · Current PI 387 ✓
130th overall · 36th female (▲ up 20)
Section time 1h14m03s · 12:46 /km
Section 5.8 km · +365 / −63 m
expected at11:29 cut-off at12:30
in11:04:07
25 min FASTER than expected
Section PI 353 — at career level
FINISH · 28.8 km · Current PI 357 ✓
128th overall · 36th female (▲ up 2)
Section time 19m50s · 8:37 /km
Section 2.3 km · +16 / −168 m
expected at11:28 cut-off at13:00
in11:23:57
4 min FASTER than expected
Section PI 396 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run