← 25KM leaderboard

MATAYANIT, DUANGPORN

Race 25KM · Bib 2676 · Female · iTRA PI 277
Status
Finished
Total time 6h45m37s
Finished at Sun 28 Jun 12:45:37
Effort today
Current PI: 283
iTRA PI 277 · running at career level (102%)
Aid station schedule
START · 0.0 km
in06:00:00
A1 · 4.9 km · Current PI 277
Section time 50m25s
Section 4.9 km · +78 / −224 m
expected at06:48 cut-off at06:50
in06:50:25
2 min SLOWER than expected
Section PI 340 — going harder than career
W0 · 13.5 km · Current PI 321
Section time 2h44m55s
Section 8.6 km · +499 / −486 m
expected at09:35 cut-off at09:20
in09:35:20
0 min FASTER than expected
Section PI 235 — at career level
A5 · 20.7 km · Current PI 247
Section time 1h14m59s
Section 7.2 km · +130 / −149 m
expected at10:57 cut-off at10:50
in10:50:19
7 min FASTER than expected
Section PI 333 — going harder than career
W1 · 26.5 km · Current PI 316
Section time 1h30m39s
Section 5.8 km · +365 / −63 m
expected at12:34 cut-off at12:30
in12:20:58
13 min FASTER than expected
Section PI 289 — at career level
FINISH · 28.8 km · Current PI 285
Section time 24m39s
Section 2.3 km · +16 / −168 m
expected at12:47 cut-off at13:00
in12:45:37
1 min FASTER than expected
Section PI 319 — at career level
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.