← 25KM leaderboard

KAEWTA, ONANONG

Race 25KM · Bib 2693 · Female · iTRA PI 259
Status
Finished
Total time 7h24m44s
Finished at Sun 28 Jun 13:24:44
Effort today
Current PI: 258
iTRA PI 259 · running at career level (100%)
Aid station schedule
START · 0.0 km
in06:00:00
A1 · 4.9 km · Current PI 259
Section time 45m32s
Section 4.9 km · +78 / −224 m
expected at06:51 cut-off at06:50
in06:45:32
5 min FASTER than expected
Section PI 377 — way above career, blow-up risk
W0 · 13.5 km · Current PI 341
Section time 3h00m20s
Section 8.6 km · +499 / −486 m
expected at09:14 cut-off at09:20
in09:45:52
31 min SLOWER than expected
Section PI 215 — at career level
A5 · 20.7 km · Current PI 228
Section time 1h26m59s
Section 7.2 km · +130 / −149 m
expected at11:12 cut-off at10:50
in11:12:51
0 min SLOWER than expected
Section PI 287 — at career level
W1 · 26.5 km · Current PI 278
Section time 1h49m04s
Section 5.8 km · +365 / −63 m
expected at13:05 cut-off at12:30
in13:01:55
3 min FASTER than expected
Section PI 240 — at career level
FINISH · 28.8 km · Current PI 246
Section time 22m49s
Section 2.3 km · +16 / −168 m
expected at13:31 cut-off at13:00
in13:24:44
6 min FASTER than expected
Section PI 344 — going harder than career
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.