Status
Finished
Total time 7h22m03s
Finished at Sun 28 Jun 13:37:03
Effort today
Current Performance Index: 260
(no iTRA PI) · Current PI: 260
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 337390418441432
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 337390418441
Aid station schedule
START · 0.0 km ✓
out06:15:00
A1 · 4.9 km ✓
337th overall · 107th female
Section time 46m17s · 9:27 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in07:01:17
Section PI 370
W0 · 13.5 km · Current PI 370 ✓
390th overall · 117th female (▼ down 53)
Section time 2h44m57s · 19:11 /km
Section 8.6 km · +499 / −486 m
expected at09:33 cut-off at09:20
in09:46:14
13 min SLOWER than expected
Section PI 235
A5 · 20.7 km · Current PI 235 ✓
418th overall · 123rd female (▼ down 28)
Section time 1h27m03s · 12:05 /km
Section 7.2 km · +130 / −149 m
expected at11:07 cut-off at10:50
in11:13:17
6 min SLOWER than expected
Section PI 286
W1 · 26.5 km · Current PI 286 ✓
441st overall · 134th female (▼ down 23)
Section time 2h02m02s · 21:02 /km
Section 5.8 km · +365 / −63 m
expected at13:00 cut-off at12:30
in13:15:19
14 min SLOWER than expected
Section PI 214
FINISH · 28.8 km · Current PI 214 ✓
432nd overall · 133rd female (▲ up 9)
Section time 21m44s · 9:27 /km
Section 2.3 km · +16 / −168 m
expected at13:44 cut-off at13:00
in13:37:03
7 min FASTER than expected
Section PI 362
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run