Status
Withdrawn
Last seen at A5
On course for 5h15m26s before withdrawal.
Effort today
Current Performance Index: 256
iTRA PI 199 · running 29% above career level — PB pace
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 483380473
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 483380473
The dot is this runner.
Aid station schedule
START · 0.0 km ✓
out06:00:00
A1 · 4.9 km · Current PI 199 ✓
483rd overall · 146th female
Section time 49m56s · 10:11 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in06:49:56
17 min FASTER than expected
Section PI 343 — way above career, blow-up risk
W0 · 13.5 km · Current PI 300 ✓
380th overall · 112th female (▲ up 103)
Section time 2h39m08s · 18:30 /km
Section 8.6 km · +499 / −486 m
cut-off at09:20
in09:29:04
4 min FASTER than expected
Section PI 243 — at career level
A5 · 20.7 km · Current PI 230 ✓
473rd overall · 147th female (▼ down 93)
Section time 1h46m22s · 14:46 /km
Section 7.2 km · +130 / −149 m
cut-off at10:50
in11:15:26
26 min SLOWER than expected
Section PI 234 — at career level
W1 · 26.5 km
Section 5.8 km · +365 / −63 m
cut-off at12:30
FINISH · 28.8 km
Section 2.3 km · +16 / −168 m
cut-off at13:00
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run