Status
Finished
Total time 7h54m16s
Finished at Sun 28 Jun 14:09:16
Effort today
Current Performance Index: 242
(no iTRA PI) · Current PI: 242
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 664563539502505
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 664563539502
Aid station schedule
START · 0.0 km ✓
out06:15:00
A1 · 4.9 km ✓
664th overall · 219th female
Section time 59m19s · 12:06 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in07:14:19
Section PI 289
W0 · 13.5 km · Current PI 289 ✓
563rd overall · 179th female (▲ up 101)
Section time 3h10m52s · 22:12 /km
Section 8.6 km · +499 / −486 m
expected at10:28 cut-off at09:20
in10:25:11
3 min FASTER than expected
Section PI 203
A5 · 20.7 km · Current PI 203 ✓
539th overall · 172nd female (▲ up 24)
Section time 1h27m22s · 12:08 /km
Section 7.2 km · +130 / −149 m
expected at12:01 cut-off at10:50
in11:52:33
8 min FASTER than expected
Section PI 285
W1 · 26.5 km · Current PI 285 ✓
502nd overall · 157th female (▲ up 37)
Section time 1h46m34s · 18:22 /km
Section 5.8 km · +365 / −63 m
expected at13:54 cut-off at12:30
in13:39:07
14 min FASTER than expected
Section PI 245
FINISH · 28.8 km · Current PI 245 ✓
505th overall · 160th female (▼ down 3)
Section time 30m09s · 13:07 /km
Section 2.3 km · +16 / −168 m
expected at14:09 cut-off at13:00
in14:09:16
0 min FASTER than expected
Section PI 261
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run