Status
Finished
Total time 7h08m07s
Finished at Sun 28 Jun 13:38:07
Effort today
Current Performance Index: 268
(no iTRA PI) · Current PI: 268
Course profile 29 km · +1,088 m
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 142322361402389
START A1 W0 A5 W1 FINISH
Position overall at each station (1st at the top, 695 at the bottom)
1st695th 142322361402
Aid station schedule
START · 0.0 km ✓
out06:30:00
A1 · 4.9 km ✓
142nd overall · 34th female
Section time 38m14s · 7:48 /km
Section 4.9 km · +78 / −224 m
cut-off at06:50
in07:08:14
Section PI 448
W0 · 13.5 km · Current PI 448 ✓
322nd overall · 87th female (▼ down 180)
Section time 2h37m56s · 18:22 /km
Section 8.6 km · +499 / −486 m
expected at09:13 cut-off at09:20
in09:46:10
32 min SLOWER than expected
Section PI 245
A5 · 20.7 km · Current PI 245 ✓
361st overall · 101st female (▼ down 39)
Section time 1h29m22s · 12:25 /km
Section 7.2 km · +130 / −149 m
expected at11:01 cut-off at10:50
in11:15:32
14 min SLOWER than expected
Section PI 279
W1 · 26.5 km · Current PI 279 ✓
402nd overall · 119th female (▼ down 41)
Section time 1h57m15s · 20:13 /km
Section 5.8 km · +365 / −63 m
expected at12:58 cut-off at12:30
in13:12:47
14 min SLOWER than expected
Section PI 223
FINISH · 28.8 km · Current PI 223 ✓
389th overall · 115th female (▲ up 13)
Section time 25m20s · 11:01 /km
Section 2.3 km · +16 / −168 m
expected at13:40 cut-off at13:00
in13:38:07
2 min FASTER than expected
Section PI 310
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run