← 50KM leaderboard

GOTO, MASAYUKI

Race 50KM · Bib 5028 · Male · iTRA PI 515
Status
Finished
Total time 10h30m03s
Finished at Sat 27 Jun 17:30:03
Effort today
Current PI: 371
iTRA PI 515 · running 28% below career level — major fade
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 515
Section time 29m57s
Section 4.9 km · +78 / −224 m
expected at07:29 cut-off at08:00
in07:29:57
0 min FASTER than expected
Section PI 646 — way above career, blow-up risk
A2 · 14.1 km · Current PI 607
Section time 1h35m52s
Section 9.2 km · +479 / −547 m
expected at08:52 cut-off at10:50
in09:05:49
13 min SLOWER than expected
Section PI 475 — at career level
A3 · 25.3 km · Current PI 487
Section time 2h59m14s
Section 11.2 km · +713 / −699 m
expected at11:28 cut-off at14:20
in12:05:03
36 min SLOWER than expected
Section PI 329 — significantly faded
A4 · 32.3 km · Current PI 385
Section time 1h15m33s
Section 7.0 km · +206 / −217 m
expected at13:12 cut-off at16:00
in13:20:36
8 min SLOWER than expected
Section PI 393 — easing off / mild fade
A5 · 42.5 km · Current PI 429
Section time 2h14m21s
Section 10.2 km · +267 / −206 m
expected at15:02 cut-off at18:30
in15:34:57
32 min SLOWER than expected
Section PI 313 — significantly faded
W1 · 48.3 km · Current PI 373
Section time 1h29m32s
Section 5.8 km · +365 / −63 m
expected at17:04 cut-off at20:30
in17:04:29
0 min FASTER than expected
Section PI 330 — significantly faded
FINISH · 50.6 km · Current PI 385
Section time 25m34s
Section 2.3 km · +16 / −168 m
expected at17:29 cut-off at21:00
in17:30:03
0 min SLOWER than expected
Section PI 347 — significantly faded
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.