← 50KM leaderboard

SURANANCHANOK, PASU

Race 50KM · Bib 5073 · Male · iTRA PI 400
Status
Finished
Total time 10h39m02s
Finished at Sat 27 Jun 17:39:02
Effort today
Current PI: 366
iTRA PI 400 · running 8% below career level — fading
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 400
Section time 40m26s
Section 4.9 km · +78 / −224 m
expected at07:38 cut-off at08:00
in07:40:26
1 min SLOWER than expected
Section PI 478 — going harder than career
A2 · 14.1 km · Current PI 455
Section time 1h50m54s
Section 9.2 km · +479 / −547 m
expected at09:31 cut-off at10:50
in09:31:20
0 min FASTER than expected
Section PI 411 — at career level
A3 · 25.3 km · Current PI 408
Section time 2h59m19s
Section 11.2 km · +713 / −699 m
expected at12:23 cut-off at14:20
in12:30:39
7 min SLOWER than expected
Section PI 329 — easing off / mild fade
A4 · 32.3 km · Current PI 350
Section time 1h15m22s
Section 7.0 km · +206 / −217 m
expected at13:43 cut-off at16:00
in13:46:01
2 min SLOWER than expected
Section PI 394 — at career level
A5 · 42.5 km · Current PI 396
Section time 1h50m16s
Section 10.2 km · +267 / −206 m
expected at15:34 cut-off at18:30
in15:36:17
1 min SLOWER than expected
Section PI 381 — at career level
W1 · 48.3 km · Current PI 387
Section time 1h35m01s
Section 5.8 km · +365 / −63 m
expected at17:06 cut-off at20:30
in17:11:18
5 min SLOWER than expected
Section PI 311 — easing off / mild fade
FINISH · 50.6 km · Current PI 337
Section time 27m44s
Section 2.3 km · +16 / −168 m
expected at17:36 cut-off at21:00
in17:39:02
2 min SLOWER than expected
Section PI 320 — easing off / mild fade
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.