← 50KM leaderboard

KANTARIYO, PONGBHOP

Race 50KM · Bib 5104 · Male · iTRA PI 361
Status
Finished
Total time 10h49m48s
Finished at Sat 27 Jun 17:49:48
Effort today
Current PI: 360
iTRA PI 361 · running at career level (100%)
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 361
Section time 51m28s
Section 4.9 km · +78 / −224 m
expected at07:42 cut-off at08:00
in07:51:28
8 min SLOWER than expected
Section PI 376 — at career level
A2 · 14.1 km · Current PI 371
Section time 2h01m42s
Section 9.2 km · +479 / −547 m
expected at10:13 cut-off at10:50
in09:53:10
19 min FASTER than expected
Section PI 374 — at career level
A3 · 25.3 km · Current PI 370
Section time 3h05m39s
Section 11.2 km · +713 / −699 m
expected at13:09 cut-off at14:20
in12:58:49
10 min FASTER than expected
Section PI 318 — at career level
A4 · 32.3 km · Current PI 331
Section time 1h12m16s
Section 7.0 km · +206 / −217 m
expected at14:17 cut-off at16:00
in14:11:05
6 min FASTER than expected
Section PI 411 — at career level
A5 · 42.5 km · Current PI 396
Section time 1h50m15s
Section 10.2 km · +267 / −206 m
expected at16:06 cut-off at18:30
in16:01:20
5 min FASTER than expected
Section PI 381 — at career level
W1 · 48.3 km · Current PI 375
Section time 1h25m53s
Section 5.8 km · +365 / −63 m
expected at17:35 cut-off at20:30
in17:27:13
8 min FASTER than expected
Section PI 344 — at career level
FINISH · 50.6 km · Current PI 349
Section time 22m35s
Section 2.3 km · +16 / −168 m
expected at17:53 cut-off at21:00
in17:49:48
3 min FASTER than expected
Section PI 393 — at career level
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.