← 50KM leaderboard

BURANANAYOK, SUPARERK

Race 50KM · Bib 5136 · Male · iTRA PI 336
Status
Finished
Total time 12h27m04s
Finished at Sat 27 Jun 19:27:04
Effort today
Current PI: 313
iTRA PI 336 · running 7% below career level — fading
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 336
Section time 54m52s
Section 4.9 km · +78 / −224 m
expected at07:45 cut-off at08:00
in07:54:52
8 min SLOWER than expected
Section PI 353 — at career level
A2 · 14.1 km · Current PI 348
Section time 2h48m53s
Section 9.2 km · +479 / −547 m
expected at10:25 cut-off at10:50
in10:43:45
17 min SLOWER than expected
Section PI 270 — easing off / mild fade
A3 · 25.3 km · Current PI 290
Section time 3h18m52s
Section 11.2 km · +713 / −699 m
expected at14:57 cut-off at14:20
in14:02:37
55 min FASTER than expected
Section PI 297 — at career level
A4 · 32.3 km · Current PI 309
Section time 1h23m13s
Section 7.0 km · +206 / −217 m
expected at15:35 cut-off at16:00
in15:25:50
9 min FASTER than expected
Section PI 357 — at career level
A5 · 42.5 km · Current PI 350
Section time 2h04m02s
Section 10.2 km · +267 / −206 m
expected at17:41 cut-off at18:30
in17:29:52
11 min FASTER than expected
Section PI 339 — at career level
W1 · 48.3 km · Current PI 338
Section time 1h35m44s
Section 5.8 km · +365 / −63 m
expected at19:19 cut-off at20:30
in19:05:36
13 min FASTER than expected
Section PI 308 — at career level
FINISH · 50.6 km · Current PI 317
Section time 21m28s
Section 2.3 km · +16 / −168 m
expected at19:35 cut-off at21:00
in19:27:04
8 min FASTER than expected
Section PI 413 — going harder than career
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.