← 50KM leaderboard

JARUPUNPHOL, NATHEE

Race 50KM · Bib 5139 · Male · iTRA PI 333
Status
Finished
Total time 11h28m07s
Finished at Sat 27 Jun 18:28:07
Effort today
Current PI: 340
iTRA PI 333 · running at career level (102%)
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 333
Section time 40m47s
Section 4.9 km · +78 / −224 m
expected at07:46 cut-off at08:00
in07:40:47
5 min FASTER than expected
Section PI 474 — way above career, blow-up risk
A2 · 14.1 km · Current PI 432
Section time 2h00m35s
Section 9.2 km · +479 / −547 m
expected at09:32 cut-off at10:50
in09:41:22
8 min SLOWER than expected
Section PI 378 — at career level
A3 · 25.3 km · Current PI 364
Section time 3h11m47s
Section 11.2 km · +713 / −699 m
expected at12:44 cut-off at14:20
in12:53:09
8 min SLOWER than expected
Section PI 308 — at career level
A4 · 32.3 km · Current PI 315
Section time 1h23m05s
Section 7.0 km · +206 / −217 m
expected at14:10 cut-off at16:00
in14:16:14
5 min SLOWER than expected
Section PI 357 — at career level
A5 · 42.5 km · Current PI 350
Section time 2h05m00s
Section 10.2 km · +267 / −206 m
expected at16:13 cut-off at18:30
in16:21:14
8 min SLOWER than expected
Section PI 336 — at career level
W1 · 48.3 km · Current PI 335
Section time 1h38m04s
Section 5.8 km · +365 / −63 m
expected at17:58 cut-off at20:30
in17:59:18
0 min SLOWER than expected
Section PI 301 — at career level
FINISH · 50.6 km · Current PI 311
Section time 28m49s
Section 2.3 km · +16 / −168 m
expected at18:26 cut-off at21:00
in18:28:07
1 min SLOWER than expected
Section PI 308 — at career level
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.