← 50KM leaderboard

BANLUESAB, CHOOSAK

Race 50KM · Bib 5183 · Male · iTRA PI 281
Status
Finished
Total time 12h33m20s
Finished at Sat 27 Jun 19:33:20
Effort today
Current PI: 311
iTRA PI 281 · running 11% above career level — PB pace
Aid station schedule
START · 0.0 km
in07:00:00
A1 · 4.9 km · Current PI 281
Section time 57m10s
Section 4.9 km · +78 / −224 m
expected at07:54 cut-off at08:00
in07:57:10
2 min SLOWER than expected
Section PI 338 — going harder than career
A2 · 14.1 km · Current PI 321
Section time 2h22m26s
Section 9.2 km · +479 / −547 m
expected at10:34 cut-off at10:50
in10:19:36
14 min FASTER than expected
Section PI 320 — at career level
A3 · 25.3 km · Current PI 308
Section time 3h20m38s
Section 11.2 km · +713 / −699 m
expected at14:06 cut-off at14:20
in13:40:14
25 min FASTER than expected
Section PI 294 — at career level
A4 · 32.3 km · Current PI 290
Section time 1h40m27s
Section 7.0 km · +206 / −217 m
expected at15:08 cut-off at16:00
in15:20:41
12 min SLOWER than expected
Section PI 295 — at career level
A5 · 42.5 km · Current PI 291
Section time 2h01m44s
Section 10.2 km · +267 / −206 m
expected at17:34 cut-off at18:30
in17:22:25
12 min FASTER than expected
Section PI 345 — going harder than career
W1 · 48.3 km · Current PI 326
Section time 1h30m32s
Section 5.8 km · +365 / −63 m
expected at19:10 cut-off at20:30
in18:52:57
17 min FASTER than expected
Section PI 326 — at career level
FINISH · 50.6 km · Current PI 312
Section time 40m23s
Section 2.3 km · +16 / −168 m
expected at19:22 cut-off at21:00
in19:33:20
10 min SLOWER than expected
Section PI 220 — easing off / mild fade
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.