Status
Finished
Total time 4h48m43s
Finished at Sat 13 Jun 10:48:43
Effort today
Current Performance Index: 730
iTRA PI 708 · running at career level (103%)
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 8766
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 8766
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 708 ✓
8th overall · 8th male
Section time 1h28m50s · 9:33 /km
Section 9.3 km · +1121 / −99 m
expected at07:24 cut-off at09:40
in07:28:50out07:29:51
4 min SLOWER than expected
Dwell 1 minute.
Section PI 677 — at career level
A2 · 18.9 km · Current PI 686 ✓
7th overall · 7th male (▲ up 1)
Section time 1h00m33s · 6:15 /km
Section 9.7 km · +553 / −624 m
expected at08:30 cut-off at12:30
in08:30:24out08:31:38
0 min FASTER than expected
Dwell 1 minute.
Section PI 800 — going harder than career
HQ (2nd visit) · 30.5 km · Current PI 773 ✓
6th overall · 6th male (▲ up 1)
Section time 1h20m35s · 7:00 /km
Section 11.5 km · +790 / −719 m
expected at09:58 cut-off at16:20
in09:52:13out09:53:07
6 min FASTER than expected
Dwell 1 minute.
Section PI 757 — at career level
FINISH · 40.4 km · Current PI 742 ✓
6th overall · 6th male
Section time 55m36s · 5:34 /km
Section 10.0 km · +95 / −1115 m
expected at11:03 cut-off at19:00
in10:48:43
14 min FASTER than expected
Section PI 702 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run