Status
Finished
Total time 5h29m08s
Finished at Sat 13 Jun 11:29:08
Effort today
Current Performance Index: 647
iTRA PI 532 · running 22% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 10141412
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 10141412
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 532 ✓
10th overall · 10th male
Section time 1h33m37s · 10:04 /km
Section 9.3 km · +1121 / −99 m
expected at07:52 cut-off at09:40
in07:33:37out07:35:15
18 min FASTER than expected
Dwell 2 minutes.
Section PI 642 — way above career, blow-up risk
A2 · 18.9 km · Current PI 609 ✓
14th overall · 14th male (▼ down 4)
Section time 1h11m02s · 7:19 /km
Section 9.7 km · +553 / −624 m
expected at08:39 cut-off at12:30
in08:46:17out08:48:27
6 min SLOWER than expected
Dwell 2 minutes.
Section PI 682 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 637 ✓
14th overall · 14th male
Section time 1h33m32s · 8:08 /km
Section 11.5 km · +790 / −719 m
expected at10:24 cut-off at16:20
in10:21:59out10:24:45
2 min FASTER than expected
Dwell 3 minutes.
Section PI 652 — way above career, blow-up risk
FINISH · 40.4 km · Current PI 616 ✓
12th overall · 12th male (▲ up 2)
Section time 1h04m23s · 6:26 /km
Section 10.0 km · +95 / −1115 m
expected at11:43 cut-off at19:00
in11:29:08
14 min FASTER than expected
Section PI 606 — going harder than career
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run