Status
Finished
Total time 6h52m46s
Finished at Sat 13 Jun 12:52:46
Effort today
Current Performance Index: 521
iTRA PI 516 · running at career level (101%)
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 20222428
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 20222428
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 516 ✓
20th overall · 18th male
Section time 1h45m20s · 11:20 /km
Section 9.3 km · +1121 / −99 m
expected at07:55 cut-off at09:40
in07:45:20out07:46:15
10 min FASTER than expected
Dwell 1 minute.
Section PI 571 — going harder than career
A2 · 18.9 km · Current PI 554 ✓
22nd overall · 20th male (▼ down 2)
Section time 1h22m37s · 8:31 /km
Section 9.7 km · +553 / −624 m
expected at08:58 cut-off at12:30
in09:08:52out09:10:55
10 min SLOWER than expected
Dwell 2 minutes.
Section PI 586 — going harder than career
HQ (2nd visit) · 30.5 km · Current PI 565 ✓
24th overall · 22nd male (▼ down 2)
Section time 1h58m10s · 10:17 /km
Section 11.5 km · +790 / −719 m
expected at11:00 cut-off at16:20
in11:09:05out11:18:12
8 min SLOWER than expected
Dwell 9 minutes.
Section PI 516 — at career level
FINISH · 40.4 km · Current PI 516 ✓
28th overall · 25th male (▼ down 4)
Section time 1h34m34s · 9:27 /km
Section 10.0 km · +95 / −1115 m
expected at12:51 cut-off at19:00
in12:52:46
0 min SLOWER than expected
Section PI 412 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run