Status
Finished
Total time 6h22m49s
Finished at Sat 13 Jun 12:22:49
Effort today
Current Performance Index: 551
iTRA PI 475 · running 16% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 28252321
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 28252321
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 475 ✓
28th overall · 25th male
Section time 1h58m38s · 12:45 /km
Section 9.3 km · +1121 / −99 m
expected at08:05 cut-off at09:40
in07:58:38out08:00:00
7 min FASTER than expected
Dwell 1 minute.
Section PI 507 — at career level
A2 · 18.9 km · Current PI 497 ✓
25th overall · 23rd male (▲ up 3)
Section time 1h19m29s · 8:12 /km
Section 9.7 km · +553 / −624 m
expected at09:21 cut-off at12:30
in09:19:29out09:21:07
2 min FASTER than expected
Dwell 2 minutes.
Section PI 610 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 569 ✓
23rd overall · 21st male (▲ up 2)
Section time 1h44m17s · 9:04 /km
Section 11.5 km · +790 / −719 m
expected at11:16 cut-off at16:20
in11:05:24out11:06:34
10 min FASTER than expected
Dwell 1 minute.
Section PI 585 — way above career, blow-up risk
FINISH · 40.4 km · Current PI 552 ✓
21st overall · 19th male (▲ up 2)
Section time 1h16m15s · 7:38 /km
Section 10.0 km · +95 / −1115 m
expected at12:39 cut-off at19:00
in12:22:49
16 min FASTER than expected
Section PI 512 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run