Status
Finished
Total time 7h43m30s
Finished at Sat 13 Jun 13:43:30
Effort today
Current Performance Index: 461
iTRA PI 461 · running at career level (100%)
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 40363534
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 40363534
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 461 ✓
40th overall · 35th male
Section time 2h10m18s · 14:01 /km
Section 9.3 km · +1121 / −99 m
expected at08:09 cut-off at09:40
in08:10:18out08:15:11
0 min SLOWER than expected
Dwell 5 minutes.
Section PI 461 — at career level
A2 · 18.9 km · Current PI 461 ✓
36th overall · 31st male (▲ up 4)
Section time 1h34m15s · 9:43 /km
Section 9.7 km · +553 / −624 m
expected at09:44 cut-off at12:30
in09:49:26out09:53:34
4 min SLOWER than expected
Dwell 4 minutes.
Section PI 514 — going harder than career
HQ (2nd visit) · 30.5 km · Current PI 498 ✓
35th overall · 31st male (▲ up 1)
Section time 2h11m04s · 11:24 /km
Section 11.5 km · +790 / −719 m
expected at12:04 cut-off at16:20
in12:04:38out12:06:58
0 min SLOWER than expected
Dwell 2 minutes.
Section PI 466 — at career level
FINISH · 40.4 km · Current PI 464 ✓
34th overall · 30th male (▲ up 1)
Section time 1h36m32s · 9:39 /km
Section 10.0 km · +95 / −1115 m
expected at13:55 cut-off at19:00
in13:43:30
12 min FASTER than expected
Section PI 404 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run