Status
Finished
Total time 9h25m53s
Finished at Sat 13 Jun 15:25:53
Effort today
Current Performance Index: 391
iTRA PI 372 · running 5% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 50485455
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 50485455
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 372 ✓
50th overall · 42nd male
Section time 2h26m35s · 15:46 /km
Section 9.3 km · +1121 / −99 m
expected at08:40 cut-off at09:40
in08:26:35out08:33:10
14 min FASTER than expected
Dwell 7 minutes.
Section PI 410 — at career level
A2 · 18.9 km · Current PI 399 ✓
48th overall · 39th male (▲ up 2)
Section time 1h40m08s · 10:19 /km
Section 9.7 km · +553 / −624 m
expected at10:13 cut-off at12:30
in10:13:18out10:26:31
0 min FASTER than expected
Dwell 13 minutes.
Section PI 484 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 450 ✓
54th overall · 42nd male (▼ down 6)
Section time 2h34m13s · 13:25 /km
Section 11.5 km · +790 / −719 m
expected at12:50 cut-off at16:20
in13:00:44out13:13:24
10 min SLOWER than expected
Dwell 13 minutes.
Section PI 396 — at career level
FINISH · 40.4 km · Current PI 389 ✓
55th overall · 43rd male (▼ down 1)
Section time 2h12m29s · 13:15 /km
Section 10.0 km · +95 / −1115 m
expected at15:16 cut-off at19:00
in15:25:53
9 min SLOWER than expected
Section PI 294 — easing off / mild fade
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run