Status
Finished
Total time 8h03m02s
Finished at Sat 13 Jun 14:03:02
Effort today
Current Performance Index: 455
iTRA PI 368 · running 24% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 38404040
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 38404040
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 368 ✓
38th overall · 33rd male
Section time 2h08m49s · 13:51 /km
Section 9.3 km · +1121 / −99 m
expected at08:42 cut-off at09:40
in08:08:49out08:21:09
33 min FASTER than expected
Dwell 12 minutes.
Section PI 467 — going harder than career
A2 · 18.9 km · Current PI 437 ✓
40th overall · 34th male (▼ down 2)
Section time 1h35m24s · 9:50 /km
Section 9.7 km · +553 / −624 m
expected at09:49 cut-off at12:30
in09:56:33out10:03:05
6 min SLOWER than expected
Dwell 7 minutes.
Section PI 508 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 466 ✓
40th overall · 34th male
Section time 2h18m45s · 12:04 /km
Section 11.5 km · +790 / −719 m
expected at12:13 cut-off at16:20
in12:21:50out12:27:42
8 min SLOWER than expected
Dwell 6 minutes.
Section PI 440 — going harder than career
FINISH · 40.4 km · Current PI 418 ✓
40th overall · 34th male
Section time 1h35m20s · 9:32 /km
Section 10.0 km · +95 / −1115 m
expected at14:18 cut-off at19:00
in14:03:02
15 min FASTER than expected
Section PI 409 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run