Status
Finished
Total time 10h03m40s
Finished at Sat 13 Jun 16:03:40
Effort today
Current Performance Index: 366
iTRA PI 293 · running 25% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 62605960
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 62605960
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 293 ✓
62nd overall · 46th male
Section time 2h38m48s · 17:05 /km
Section 9.3 km · +1121 / −99 m
expected at09:24 cut-off at09:40
in08:38:48out08:48:14
45 min FASTER than expected
Dwell 9 minutes.
Section PI 379 — going harder than career
A2 · 18.9 km · Current PI 353 ✓
60th overall · 45th male (▲ up 2)
Section time 1h54m33s · 11:49 /km
Section 9.7 km · +553 / −624 m
expected at10:37 cut-off at12:30
in10:42:47out10:49:58
5 min SLOWER than expected
Dwell 7 minutes.
Section PI 423 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 384 ✓
59th overall · 45th male (▲ up 1)
Section time 2h39m59s · 13:55 /km
Section 11.5 km · +790 / −719 m
expected at13:28 cut-off at16:20
in13:29:57out13:46:27
0 min SLOWER than expected
Dwell 16 minutes.
Section PI 381 — going harder than career
FINISH · 40.4 km · Current PI 355 ✓
60th overall · 46th male (▼ down 1)
Section time 2h17m13s · 13:43 /km
Section 10.0 km · +95 / −1115 m
expected at15:59 cut-off at19:00
in16:03:40
4 min SLOWER than expected
Section PI 284 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run