Status
Finished
Total time 4h55m04s
Finished at Sat 13 Jun 10:55:04
Effort today
Current Performance Index: 716
iTRA PI 662 · running 8% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 9988
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 9988
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 662 ✓
9th overall · 9th male
Section time 1h29m29s · 9:37 /km
Section 9.3 km · +1121 / −99 m
expected at07:30 cut-off at09:40
in07:29:29out07:30:50
0 min FASTER than expected
Dwell 1 minute.
Section PI 672 — at career level
A2 · 18.9 km · Current PI 669 ✓
9th overall · 9th male
Section time 1h01m10s · 6:18 /km
Section 9.7 km · +553 / −624 m
expected at08:32 cut-off at12:30
in08:32:00out08:33:21
0 min FASTER than expected
Dwell 1 minute.
Section PI 792 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 753 ✓
8th overall · 8th male (▲ up 1)
Section time 1h21m44s · 7:06 /km
Section 11.5 km · +790 / −719 m
expected at10:00 cut-off at16:20
in09:55:05out09:56:07
5 min FASTER than expected
Dwell 1 minute.
Section PI 747 — going harder than career
FINISH · 40.4 km · Current PI 721 ✓
8th overall · 8th male
Section time 58m57s · 5:54 /km
Section 10.0 km · +95 / −1115 m
expected at11:07 cut-off at19:00
in10:55:04
12 min FASTER than expected
Section PI 662 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run