Status
Finished
Total time 8h16m46s
Finished at Sat 13 Jun 14:16:46
Effort today
Current Performance Index: 440
iTRA PI 364 · running 21% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 43434343
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 43434343
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 364 ✓
43rd overall · 6th female
Section time 2h16m51s · 14:43 /km
Section 9.3 km · +1121 / −99 m
expected at08:44 cut-off at09:40
in08:16:51out08:25:25
27 min FASTER than expected
Dwell 9 minutes.
Section PI 439 — going harder than career
A2 · 18.9 km · Current PI 417 ✓
43rd overall · 7th female
Section time 1h38m55s · 10:12 /km
Section 9.7 km · +553 / −624 m
expected at09:59 cut-off at12:30
in10:04:20out10:16:53
4 min SLOWER than expected
Dwell 13 minutes.
Section PI 490 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 452 ✓
43rd overall · 7th female
Section time 2h10m47s · 11:22 /km
Section 11.5 km · +790 / −719 m
expected at12:34 cut-off at16:20
in12:27:40out12:29:13
6 min FASTER than expected
Dwell 2 minutes.
Section PI 467 — way above career, blow-up risk
FINISH · 40.4 km · Current PI 436 ✓
43rd overall · 7th female
Section time 1h47m33s · 10:45 /km
Section 10.0 km · +95 / −1115 m
expected at14:21 cut-off at19:00
in14:16:46
4 min FASTER than expected
Section PI 363 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run