Status
Finished
Total time 8h36m41s
Finished at Sat 13 Jun 14:36:41
Effort today
Current Performance Index: 417
iTRA PI 307 · running 36% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 53495046
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 53495046
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 307 ✓
53rd overall · 10th female
Section time 2h27m25s · 15:51 /km
Section 9.3 km · +1121 / −99 m
expected at09:14 cut-off at09:40
in08:27:25out08:33:46
47 min FASTER than expected
Dwell 6 minutes.
Section PI 408 — way above career, blow-up risk
A2 · 18.9 km · Current PI 378 ✓
49th overall · 10th female (▲ up 4)
Section time 1h39m49s · 10:17 /km
Section 9.7 km · +553 / −624 m
expected at10:15 cut-off at12:30
in10:13:35out10:21:52
1 min FASTER than expected
Dwell 8 minutes.
Section PI 485 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 432 ✓
50th overall · 11th female (▼ down 1)
Section time 2h21m19s · 12:17 /km
Section 11.5 km · +790 / −719 m
expected at12:45 cut-off at16:20
in12:43:11out12:44:51
2 min FASTER than expected
Dwell 2 minutes.
Section PI 432 — way above career, blow-up risk
FINISH · 40.4 km · Current PI 394 ✓
46th overall · 10th female (▲ up 4)
Section time 1h51m50s · 11:11 /km
Section 10.0 km · +95 / −1115 m
expected at14:43 cut-off at19:00
in14:36:41
7 min FASTER than expected
Section PI 349 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run