Status
Finished
Total time 10h48m46s
Finished at Sat 13 Jun 16:48:46
Effort today
Current Performance Index: 358
iTRA PI 299 · running 20% above career level — PB pace
Course profile 40 km · +2,559 m
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 57596267
START HQ A2 HQ FINISH
Position overall at each station (1st at the top, 83 at the bottom)
1st83rd 57596267
Aid station schedule
START · 0.0 km ✓
out06:00:00
HQ · 9.3 km · Current PI 299 ✓
57th overall · 14th female
Section time 2h35m00s · 16:40 /km
Section 9.3 km · +1121 / −99 m
expected at09:20 cut-off at09:40
in08:35:00out08:54:15
45 min FASTER than expected
Dwell 19 minutes.
Section PI 388 — going harder than career
A2 · 18.9 km · Current PI 361 ✓
59th overall · 15th female (▼ down 2)
Section time 1h42m36s · 10:35 /km
Section 9.7 km · +553 / −624 m
expected at10:40 cut-off at12:30
in10:36:51out10:55:12
4 min FASTER than expected
Dwell 18 minutes.
Section PI 472 — way above career, blow-up risk
HQ (2nd visit) · 30.5 km · Current PI 420 ✓
62nd overall · 16th female (▼ down 3)
Section time 2h57m45s · 15:27 /km
Section 11.5 km · +790 / −719 m
expected at13:25 cut-off at16:20
in13:52:57out14:22:06
27 min SLOWER than expected
Dwell 29 minutes.
Section PI 343 — at career level
FINISH · 40.4 km · Current PI 330 ✓
67th overall · 20th female (▼ down 5)
Section time 2h26m40s · 14:40 /km
Section 10.0 km · +95 / −1115 m
expected at16:35 cut-off at19:00
in16:48:46
13 min SLOWER than expected
Section PI 266 — at career level
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run