← N3 leaderboard

KAEWCHOMPOO, JIRAYUS

Race N3 · Bib 3062 · Male · iTRA PI 296
Status
Finished
Total time 12h05m19s
Finished at Sat 13 Jun 17:05:19
Effort today
Current PI: 445
iTRA PI 296 · running 50% above career level — PB pace
Aid station schedule
START · 0.0 km
in05:00:00
HQ_IN_1 · 9.3 km · Current PI 296
Section time 2h07m23s
Section 9.3 km · +1121 / −99 m
expected at08:15 cut-off at08:25
in07:07:23out07:11:13
67 min FASTER than expected
Dwell 4 minutes.
Section PI 504 — way above career, blow-up risk
A1_IN · 24.6 km · Current PI 442
Section time 2h39m20s
Section 15.3 km · +514 / −1509 m
expected at09:45 cut-off at12:40
in09:50:33out10:06:52
4 min SLOWER than expected
Dwell 16 minutes.
Section PI 462 — way above career, blow-up risk
A2_IN · 33.4 km · Current PI 412
Section time 2h27m52s
Section 8.8 km · +1154 / −230 m
expected at12:39 cut-off at16:10
in12:34:44out12:40:51
4 min FASTER than expected
Dwell 6 minutes.
Section PI 434 — way above career, blow-up risk
HQ_IN_2 · 44.9 km · Current PI 393
Section time 2h23m32s
Section 11.5 km · +790 / −719 m
expected at14:57 cut-off at19:40
in15:04:23out15:09:22
7 min SLOWER than expected
Dwell 5 minutes.
Section PI 454 — way above career, blow-up risk
FINISH · 54.9 km · Current PI 407
Section time 1h55m57s
Section 10.0 km · +95 / −1115 m
expected at17:05 cut-off at22:00
in17:05:19
0 min SLOWER than expected
Section PI 360 — going harder than career
Current PI blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.