Status
Finished
Total time 15h08m29s
Finished at Sat 13 Jun 20:08:29
Effort today
Current Performance Index: 351
(no iTRA PI) · Current PI: 351
Course profile 55 km · +3,675 m
START HQ A1 A2 HQ FINISH
Position overall at each station (1st at the top, 104 at the bottom)
1st104th 6769656054
START HQ A1 A2 HQ FINISH
Position overall at each station (1st at the top, 104 at the bottom)
1st104th 6769656054
Aid station schedule
START · 0.0 km ✓
out05:00:00
HQ · 9.3 km ✓
67th overall · 20th female
Section time 2h35m56s · 16:46 /km
Section 9.3 km · +1121 / −99 m
cut-off at08:25
in07:35:56out07:43:40
Dwell 8 minutes.
Section PI 412
A1 · 24.6 km · Current PI 412 ✓
69th overall · 22nd female (▼ down 2)
Section time 3h37m16s · 14:12 /km
Section 15.3 km · +514 / −1509 m
expected at10:53 cut-off at12:40
in11:20:56out11:30:15
27 min SLOWER than expected
Dwell 9 minutes.
Section PI 339
A2 · 33.4 km · Current PI 339 ✓
65th overall · 18th female (▲ up 4)
Section time 3h12m59s · 21:56 /km
Section 8.8 km · +1154 / −230 m
expected at14:48 cut-off at16:10
in14:43:14out14:47:44
5 min FASTER than expected
Dwell 4 minutes.
Section PI 333
HQ (2nd visit) · 44.9 km · Current PI 333 ✓
60th overall · 16th female (▲ up 5)
Section time 2h53m36s · 15:06 /km
Section 11.5 km · +790 / −719 m
expected at17:45 cut-off at19:40
in17:41:20out17:47:19
4 min FASTER than expected
Dwell 6 minutes.
Section PI 376
FINISH · 54.9 km · Current PI 376 ✓
54th overall · 14th female (▲ up 6)
Section time 2h21m10s · 14:07 /km
Section 10.0 km · +95 / −1115 m
expected at20:15 cut-off at22:00
in20:08:29
6 min FASTER than expected
Section PI 295
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run