Status
Finished
Total time 9h57m33s
Finished at Sat 13 Jun 14:57:33
Effort today
Current Performance Index: 525
(no iTRA PI) · Current PI: 525
Course profile 55 km · +3,675 m
START HQ A1 A2 HQ FINISH
Position overall at each station (1st at the top, 104 at the bottom)
1st104th 66676
START HQ A1 A2 HQ FINISH
Position overall at each station (1st at the top, 104 at the bottom)
1st104th 66676
Aid station schedule
START · 0.0 km ✓
out05:00:00
HQ · 9.3 km ✓
6th overall · 5th male
Section time 1h50m08s · 11:51 /km
Section 9.3 km · +1121 / −99 m
cut-off at08:25
in06:50:08out06:52:23
Dwell 2 minutes.
Section PI 583
A1 · 24.6 km · Current PI 583 ✓
6th overall · 5th male
Section time 2h15m11s · 8:50 /km
Section 15.3 km · +514 / −1509 m
expected at09:06 cut-off at12:40
in09:07:34out09:10:59
1 min SLOWER than expected
Dwell 3 minutes.
Section PI 544
A2 · 33.4 km · Current PI 544 ✓
6th overall · 5th male
Section time 2h09m46s · 14:45 /km
Section 8.8 km · +1154 / −230 m
expected at11:21 cut-off at16:10
in11:20:45out11:23:07
0 min FASTER than expected
Dwell 2 minutes.
Section PI 495
HQ (2nd visit) · 44.9 km · Current PI 495 ✓
7th overall · 6th male (▼ down 1)
Section time 2h04m38s · 10:50 /km
Section 11.5 km · +790 / −719 m
expected at13:20 cut-off at19:40
in13:27:45out13:29:05
6 min SLOWER than expected
Dwell 1 minute.
Section PI 523
FINISH · 54.9 km · Current PI 523 ✓
6th overall · 5th male (▲ up 1)
Section time 1h28m28s · 8:51 /km
Section 10.0 km · +95 / −1115 m
expected at15:09 cut-off at22:00
in14:57:33
11 min FASTER than expected
Section PI 471
Current PI (Performance Index) blends how the runner is going right now with their career score: about 70% their most recent section and 30% their career iTRA PI. It updates every section and is the level we use to predict the next one. (Before the first section it's just the career iTRA PI; a runner with no career PI uses their latest section alone.)

Section PI is what that one section implies on its own — that single leg's pace against the reference, ignoring the rest of the race.

Read either against the runner's career iTRA PI: a higher number means they ran harder than their score predicts; lower means slower (tired, or pacing on purpose).

Expected at is our predicted arrival at the next aid station: its terrain-adjusted (“equivalent”) distance run at the Current PI's pace, plus a small allowance for fade because runners slow over a long day. It refreshes each time a section finishes.

maths by myresults.run